Neilcott Construction Limited

Education

Sector Education

Harrow School Dining Hall

Harrow School Churchill Dining Hall The Governors of Harrow School have invested in an ambitious campus development programme that will provide an abiding legacy for decades to come BREEAM Excellent Masterplan project Phased refurbishment Client:Harrow School Contract:JCT D&B Refurbishment & extension of the Shepherd Churchill Dining Hall at Harrow School, modernising a busy facility that serves over 3,000 meals each day while keeping daily catering operations running throughout. The works improved circulation, accessibility and flexibility through phased internal refurbishment, a new cookline, upgraded finishes, flexible dining areas, a new entrance infill extension, and a new stair and lift core. GALLERY IMAGES FOR Harrow School Shepherd Churchill Dining Hall skip render: ucaddon_next_prev_post

Harrow School Dining Hall Read More »

Riverside Primary School

Riverside Primary Retaining historic features of the listed building while enhancing educational facilities Live Site Grade II Listed Protection of Historic Features BREEAM Client:London Borough of Southwark Contract:JCT Standard with Contractor Design Value:£5.3m The Victorian Grade II listed Riverside Primary School was carefully adapted and extended to enhance its teaching and dining facilities while preserving its historic character. The project included a new teaching, entrance, and kitchen/dining block, along with the refurbishment of the east corner of the existing building. Sustainability was a key focus, with features such as a green roof installation, enhancing environmental performance while providing additional educational opportunities for students. The project successfully blended modern functionality with the heritage of the site, creating a high-quality learning environment for future generations. Built to BREEAM credentials. GALLERY IMAGES FOR Riverside Primary Next

Riverside Primary School Read More »

Kingston University, Penrhyn Road

Kingston University Improving and updating the facilities at Penrhyn Road Campus to enhance the student experience Higher Education Refurb & Fit Out Live Site BREEAM Excellent Client:Kingston University Estates Contract:JCT Design & Build Value:£16.1m Neilcott were appointed to undertake major refurbishment works at Kingston University’s Penrhyn Road Campus. The project has been delivered in two phases, with work commencing in the vacant library space which has been transformed into the new home of the Union of Kingston Students, followed by refurbishment of the old student union space, into a new Careers Centre. The project scope also captured works to circulation corridor spaces, external landscaping and a new main building reception. As well as the creation of a new catering area, a relax zone, collaboration working areas and improved external landscapes. GALLERY IMAGES FOR Kingston University, Penrhyn Road Previous Next

Kingston University, Penrhyn Road Read More »

Charter School

Charter School Restoration and new build works to provide purpose for a building of local importance Local importance Restoration & new build Feature brickwork Client:London Borough of Southwark Contract:JCT D&B Value:£11.4m Works for the former derelict East Dulwich Hospital have provided a new home to the Charter School East Dulwich. Works included structural repairs, protection of war memorial elements and complete internal andexternal refurbishment of the existing three storey 1880’s building ‘The Chateau’. The scheme also included the design and construction of a new single-storey building which provides a combination of changing rooms, café, circulation, fitness centre and sports hall. GALLERY IMAGES FOR Charter School skip render: ucaddon_next_prev_post

Charter School Read More »

University of the Arts London

University of Arts London Remodelling existing campus accommodation to provide new specialist performing arts teaching facilities Comprehensive M&E upgrades Inspiring learning environments Occupied Higher Education Campus H&S interface with public Client:University of the Arts London Contract:JCT Intermediate Building Contract with Design Value:Phase 2A – £909kPhase 2B-D – £6.8m We undertook phased remodelling & refurbishment works at Wimbledon College of Art to modify the existing accommodation & engineering services, to support the College’s intended future use as a specialist performing arts centre within the University of Arts London “A huge thank you. You have been so great to work with on the this project, and the College is really happy with the quality of the work.” Sirisa Clark – UAL Client Liaison Property Manager” GALLERY IMAGES FOR UAL Previous Next

University of the Arts London Read More »

Gayhurst School

Gayhurst School Demolition & construction of a new hall, new performing arts auditorium & staff accommodation block. Demolition New Build Traditional New Performing Arts Auditorium Client:Gayhurst School Contract:JCT Standard Building Contract Value:£5.5m Founded in 1908, Gayhurst has a rich history of over 113 years. In the school’s centenery year in 2008, Gayhurst welcomed girls to the school to become the local area’s only independent co-educational Preparatory School. The school is extremely proud of its illustrious history, with a sense of tradition in a forward looking, modern provision. Gayhurst is divided into Junior School (Nursery to Year 2, ages 3 to 7), and Senior (Years 3 to 6, ages 7-11), both of which are spread across the one site. Works were delivered by our team based at the Hemel Hempstead office, with demolition of the existing sports hall and construction of a new hall, new performing arts auditorium and staff accommodation block. GALLERY IMAGES FOR Gayhurst School Previous Next

Gayhurst School Read More »

Sandringham Primary School

Sandringham Primary School Sandringham Primary School is a successful primary school in the London Borough of Newham, with over 1000 children. SEN provision Live education site Purpose built sandpit soft play landscaping Client:London Borough of Newham Contract:JCT Design & Build Value:£1m Construction of a single-storey SEN block within the existing school playground, consisting of a new flexible teaching space, a dedicated sensory and soft play room, a hygiene room, WC and a purpose built store room. All these spaces have been designed to be able to cater to a variety of needs and disabilities to ensure maximum benefit to both school and pupils. The project also provided a range of landscaping improvements, including new paving around the new building, a purpose built sandpit and soft landscaping planting area.  GALLERY IMAGES FOR Sandringham Primary School Previous Next

Sandringham Primary School Read More »

Harrow School Science Building

Harrow School Science Building The Governors of Harrow School have invested in an ambitious campus development programme that will provide an abiding legacy for decades to come BREEAM Excellent State-of-the-art new STEM Facilities Sustainable-energy Centre Client:Harrow School Contract:JCT D&B Value:£16.5m BREEAM Excellent new Science Building providing 16 state-of-the-art Biology & Chemistry laboratories, 178-seat lecture theatre equipped with the latest audio-visual technology, a stunning digital LCD wall and a sustainable energy centre which will supply efficient utilities to the Science Building, future new Sports Centre and other parts of the school. GALLERY IMAGES FOR Harrow School Science Building Previous Next

Harrow School Science Building Read More »

Notting Hill and Ealing High School

Notting Hill & Ealing High School Design and construction of a new timber glulam and CLT framed Junior School Building designed with future-proofing in mind. BREEAM CLT Complex Logistics Live Occupied Site Client:Girls Day School Trust Contract:JCT Design & Build Value:£15.7m Design and construction of a new timber glulam and CLT framed Junior School Building. Providing teaching spaces for creative arts, life sciences, technology/ICT, music and general study, as well as play space, administration offices, a multi-functional hall and additional teaching spaces for the sixth form of the senior school. Designed with future proofing in mind, a whole lifecyle approach has been adopted with the inclusion of highly energy efficient features to meet BREEAM ‘Very Good’. GALLERY IMAGES FOR Notting Hill & Ealing High School Previous Next

Notting Hill and Ealing High School Read More »

Brighton Girls Schools 007

Brighton Girls School

Brighton Girls Schools Ambitious development for Brighton Girls School, working across several listed buildings within a historic campus. Remodelling & Refurbishment Historic Campus Music centre including classrooms, practice rooms, specialist music storage & flexible performance spaceWellbeing Café Client:Girls Day School Trust Contract:JCT Design & Build Value:Montpelier & Admin – £464kVicarage Building – £1.1mTemple Building – £2.8m Neilcott has successfully delivered multiple projects for Girls’ Day School Trust, including the transformation of the Montpelier site where the Senior school and Sixth Form are located. This ambitious community building project welcomes the public for the first time into the former home of Regency city landowner Thomas Kemp. The ornate listed landmark building has been reworked to become a community hub including a learning space for pupils, and a flexible working space for local entrepreneurs to use and a pop-up wellbeing café. GALLERY IMAGES FOR Brighton Girls Schools Previous Next

Brighton Girls School Read More »