Neilcott Construction Limited

Education

Sector Education

Walton Leigh School

Walton Leigh Shool Creating a purpose-built learning environment for pupils with special educational needs and disabilities. Demolition SEND Purpose-built facilities Client:Surrey County Council Contract:JCT D&B 2024 Value:£11.4m Demolition of the existing school buildings and the construction of a new purpose-built SEND school. The new facility has been designed to provide a modern, safe and supportive learning environment, with spaces tailored to the needs of pupils, staff and the wider school community. The scheme will deliver improved teaching accommodation, enhanced accessibility and a high-quality setting that supports specialist education now and into the future. GALLERY IMAGES FOr walton leigh skip render: ucaddon_next_prev_post

Walton Leigh School Read More »

All Saints SEMH School

All Saints SEMH School A carefully planned environment for learning and wellbeing Demolition M&E upgrades Extension Client:Bracknell Forest District Council Contract:JCT D&B Value:£8.8m Design and construction of a new Special Educational Needs and Mental Health (SEMH) school for up to 50 pupils at the former All Saints Church of England Primary School site in Warfield, Bracknell. The works include building a new two-storey extension, linked to the existing building via a single-storey corridor. The scheme also covers the refurbishment of part of the existing structure, partial demolition of buildings, and removal of temporary units, all delivered under one contract. GALLERY IMAGES FOr All saints skip render: ucaddon_next_prev_post

All Saints SEMH School Read More »

Meadowcroft Primary School

Meadowcroft Primary School Creating space for pupils to grow, learn and thrive. New build Refurbishment MUGA Client:Surrey County Council Contract:JCT Intermediate Building Contract with Contractor’s Design 2016 Value:£5.2m Provision of a new school building, refurbishment works and wider site improvements to support the school’s expansion into a one form entry all-through setting. The works include four new classrooms, a library and group learning spaces, hygiene facilities, indoor and outdoor teaching areas, a multi-use games area, landscaping, services upgrades and improvements to the existing building.  GALLERY IMAGES FOr meadowcroft skip render: ucaddon_next_prev_post

Meadowcroft Primary School Read More »

New Line Academy & Tiger Primary School

New Line Academy & Tiger Primary New, enhanced learning & performance spaces Music block Specialist practice rooms New performance hall Client:Future Schools Trust Contract:JCT D&B 2024 Value:£6m The new development will include four modern classrooms, specialist practice rooms, a new performance hall,two new early years classrooms & a vibrant activity hall. These facilities will be united within a single, purpose-built structure, featuring a shared lobby that seamlessly connects Tiger Primary School’s activity hall with New Line Learning Academy’s new teaching and performance spaces. GALLERY IMAGES FOr New line & Tiger skip render: ucaddon_next_prev_post

New Line Academy & Tiger Primary School Read More »

Bramley Oak School

Bramley Oak School Creating a specialist learning environment with new teaching, sport and support spaces designed around pupil needs. Specialist educational needs Extension & Refurbishment Early contractor involvement Client:Surrey County Council Contract:JCT D&B Value:£5.7m A new special educational needs and disabilities unit extension and school refurbishment, accommodating 49 pupils with external access, parking and landscaping works. GALLERY IMAGES FOR Bramley Oak School skip render: ucaddon_next_prev_post

Bramley Oak School Read More »

St Pauls C of E Infant School

St Pauls C of E School Supporting St Paul’s transition to primary, by creating their first year 3 class. Refurbishment Extension Phased Completion Client:Surrey County Council Contract:JCT Standard Building Contract with Quantities 2016 Value:£4.7m Refurbishmentand remodelling of the existing school hall, kitchen,classrooms, and W/C’s. Works include groundclearance, construction of steel frame, block andbrick building, ground and foundation works,drainage, internal fit out, decoration, installationof new M&E service, connection to existing M&Eservices and landscaping. GALLERY IMAGES FOR St Pauls C of E skip render: ucaddon_next_prev_post

St Pauls C of E Infant School Read More »

UCL Main Quad & Wilkins Building

UCL Main Quad & Wilkins Building Design and construction of a new two‑storey school building with high‑quality external and community facilities Grade I & Grade II listed buildings Live university campus Specialist subcontractors Client:University College London Contract:JCT D&B Value:£12.7m Remodelling of University College London’s landmark Main Quad and refurbishment of the Wilkins Building to improve access, functionality and campus arrival while protecting its Grade I and II listed heritage.The works include landscaping, new study and event spaces, service upgrades, sustainability measures and careful live-campus logistics ahead of the 2026 Bicentenary. GALLERY IMAGES FOR UCL Main Quad & Wilkins skip render: ucaddon_next_prev_post

UCL Main Quad & Wilkins Building Read More »

Watergate School

Watergate School Design and construction of a new two‑storey school building with high‑quality external and community facilities MUGA SEN Green roofs Client:London Borough of Southwark Contract:JCT D&B Value:£9m A new two-storey teaching building for Watergate School, alongside an operational school in a constrained residential setting. The works included external play, garden and community facilities, supported by careful logistics, stakeholder liaison and strong environmental performance. GALLERY IMAGES FOR Watergate School skip render: ucaddon_next_prev_post

Watergate School Read More »

Harrow School Dining Hall

Harrow School Churchill Dining Hall The Governors of Harrow School have invested in an ambitious campus development programme that will provide an abiding legacy for decades to come BREEAM Excellent Masterplan project Phased refurbishment Client:Harrow School Contract:JCT D&B Refurbishment & extension of the Shepherd Churchill Dining Hall at Harrow School, modernising a busy facility that serves over 3,000 meals each day while keeping daily catering operations running throughout. The works improved circulation, accessibility and flexibility through phased internal refurbishment, a new cookline, upgraded finishes, flexible dining areas, a new entrance infill extension, and a new stair and lift core. GALLERY IMAGES FOR Harrow School Shepherd Churchill Dining Hall skip render: ucaddon_next_prev_post

Harrow School Dining Hall Read More »

Riverside Primary School

Riverside Primary Retaining historic features of the listed building while enhancing educational facilities Live Site Grade II Listed Protection of Historic Features BREEAM Client:London Borough of Southwark Contract:JCT Standard with Contractor Design Value:£5.3m The Victorian Grade II listed Riverside Primary School was carefully adapted and extended to enhance its teaching and dining facilities while preserving its historic character. The project included a new teaching, entrance, and kitchen/dining block, along with the refurbishment of the east corner of the existing building. Sustainability was a key focus, with features such as a green roof installation, enhancing environmental performance while providing additional educational opportunities for students. The project successfully blended modern functionality with the heritage of the site, creating a high-quality learning environment for future generations. Built to BREEAM credentials. GALLERY IMAGES FOR Riverside Primary Next

Riverside Primary School Read More »