Neilcott Construction Limited

Edit Content

Education

Sector Education

University of the Arts London

University of Arts London Remodelling existing campus accommodation to provide new specialist performing arts teaching facilities Comprehensive M&E upgrades Inspiring learning environments Occupied Higher Education Campus H&S interface with public Client:University of the Arts London Contract:JCT Intermediate Building Contract with Design Value:Phase 2A – £909kPhase 2B-D – £6.8m We undertook phased remodelling & refurbishment works at Wimbledon College of Art to modify the existing accommodation & engineering services, to support the College’s intended future use as a specialist performing arts centre within the University of Arts London “A huge thank you. You have been so great to work with on the this project, and the College is really happy with the quality of the work.” Sirisa Clark – UAL Client Liaison Property Manager” GALLERY IMAGES FOR UAL Previous Next

University of the Arts London Read More »

Sandringham Primary School

Sandringham Primary School Sandringham Primary School is a successful primary school in the London Borough of Newham, with over 1000 children. SEN provision Live education site Purpose built sandpit soft play landscaping Client:London Borough of Newham Contract:JCT Design & Build Value:£1m Construction of a single-storey SEN block within the existing school playground, consisting of a new flexible teaching space, a dedicated sensory and soft play room, a hygiene room, WC and a purpose built store room. All these spaces have been designed to be able to cater to a variety of needs and disabilities to ensure maximum benefit to both school and pupils. The project also provided a range of landscaping improvements, including new paving around the new building, a purpose built sandpit and soft landscaping planting area.  GALLERY IMAGES FOR Sandringham Primary School Previous Next

Sandringham Primary School Read More »

Gayhurst School

Gayhurst School Demolition & construction of a new hall, new performing artsauditorium & staff accommodation block. Demolition New Build Traditional New Performing Arts Auditorium Client:Gayhurst School Contract:JCT Standard Building Contract Value:£5.5m Founded in 1908, Gayhurst has a rich history of over 113 years. In the school’s centenery year in 2008, Gayhurst welcomed girls to the school to become the local area’s only independent co-educational Preparatory School. The school is extremely proud of its illustrious history, with a sense of tradition in a forward looking, modern provision. Gayhurst is divided into Junior School (Nursery to Year 2, ages 3 to 7), and Senior (Years 3 to 6, ages 7-11), both of which are spread across the one site. Works are being delivered by our team based at the Hemel Hempstead office, with demolition of the existing sports hall and construction of a new hall, new performing arts auditorium and staff accommodation block. GALLERY IMAGES FOR Gayhurst School Previous Next

Gayhurst School Read More »

Notting Hill and Ealing High School

Notting Hill & Ealing High School Design and construction of a new timber glulam and CLT framed Junior School Building designed with future-proofing in mind. BREEAM CLT Complex Logistics Live Occupied Site Client:Girls Day School Trust Contract:JCT Design & Build Value:£15.7m Design and construction of a new timber glulam and CLT framed Junior School Building. Providing teaching spaces for creative arts, life sciences, technology/ICT, music and general study, as well as play space, administration offices, a multi-functional hall and additional teaching spaces for the sixth form of the senior school. Designed with future proofing in mind, a whole lifecyle approach has been adopted with the inclusion of highly energy efficient features to meet BREEAM ‘Very Good’. GALLERY IMAGES FOR Notting Hill & Ealing High School Previous Next

Notting Hill and Ealing High School Read More »

Harrow School Science Building

Harrow School Science Building The Governors of Harrow School have invested in an ambitious campus development programme that will provide an abiding legacy for decades to come BREEAM Excellent State-of-the-art new STEM Facilities Sustainable-energy Centre Client:Harrow School Contract:JCT D&B Value:£16.5m BREEAM Excellent new Science Building providing 16 state-of-the-art Biology & Chemistry laboratories, 178-seat lecture theatre equipped with the latest audio-visual technology, a stunning digital LCD wall and a sustainable energy centre which will supply efficient utilities to the Science Building, future new Sports Centre and other parts of the school. GALLERY IMAGES FOR Harrow School Science Building Previous Next

Harrow School Science Building Read More »

Bayes Business School

Bayes Business School Creating a new landmark base for this globally renowned Business School within 33 Finsbury Sq CAT B Fit Out Landmark Quality Occupied Higher Education Campus SKA Gold Rating Client:City University London Contract:JCT Design & Build Value:£14.2m CAT B refurbishment and fit out works across 9 storeys, including basement and lightwell, to upgrade existing facilities and provide a new HQ for the Bayes Business School, bringing together departments and specialists from across the campus to a centralised building for all business related courses. Neilcott undertook fit out works throughout the building to facilitate the growth of the school and enhance the way it delivers education, delivering 5 new lecture theatres, new executive offices and meeting rooms, syndicate rooms, new comms, AHU and plant upgrades and feature timber ceiling and wall panelling throughout. “Since having taken occupation, the responses have been nothing but praise for how the spaces have been transformed into cutting-edge learning environments.” Guido de Koning, Associate Project Manager, Property & Facilities, City, University of London GALLERY IMAGES FOR Bayes Business School Previous Next

Bayes Business School Read More »

Brighton Girls Schools 007

Brighton Girls School

Brighton Girls Schools Ambitious development for Brighton Girls School, working across several listed buildings within a historic campus. Remodelling & Refurbishment Historic Campus Music centre including classrooms, practice rooms, specialist music storage & flexible performance spaceWellbeing Café Client:Girls Day School Trust Contract:JCT Design & Build Value:Montpelier & Admin – £464kVicarage Building – £1.1mTemple Building – £2.8m Neilcott has successfully delivered multiple projects for Girls’ Day School Trust, including the transformation of the Montpelier site where the Senior school and Sixth Form are located. This ambitious community building project welcomes the public for the first time into the former home of Regency city landowner Thomas Kemp. The ornate listed landmark building has been reworked to become a community hub including a learning space for pupils, and a flexible working space for local entrepreneurs to use and a pop-up wellbeing café. GALLERY IMAGES FOR Brighton Girls Schools Previous Next

Brighton Girls School Read More »

Leyton Green Partnership Project 002

Leyton Green Partnership Project

Leyton Green Partnership Project New purpose-built facilities across social care and education Occupied school site – vulnerable residents Complex logistics Specialist SEN equipment Combined residential and Social care stakeholders Client:London Borough of Waltham Forest Contract:JCT Standard  Value:£8.7m New purpose-built facilities across social care and education, creating a new residential 3-bed house and a 5-bed respite care facility. Complimented by a provision of therapeutic services and a new Construction & Catering building, Drama Hall and Recording Studio. We also provided an extension to the Gym, an all-weather MUGA pitch and remodelling works to the existing Belmont Park SEN School to create vocational training facilities to help youngsters gain skills and expertise to enable them to be employable.  GALLERY IMAGES FOR Leyton Green Partnership Project Previous Next

Leyton Green Partnership Project Read More »

Redwood Academy

Redwood Academy ‘Live’ SEN school expansion to provide additional general & specialist teaching accommodation Live SEN school site HS interface SEN equipment Studio space Client: Portsmouth City Council Contract: JCT Design & Build Value: £2m Works comprised of design and construction of a single storey extension to the existing school, providing 6 general classrooms and 1 studio classroom, together with associated group rooms, store rooms and toilets. As well as  construction of a two-storey extension and installation of a passenger lift to provide lift access and additional storage facilities to the existing school building. All designed with SEN requirements in mind, to cater to the schools pupils and their complex learning difficulties and behavioural needs. GALLERY IMAGES FOR Redwood Academy Previous Next

Redwood Academy Read More »

Hampton School Quad Infill

Hampton School A creative and transformational project converting an unused external quad into an inspirational hub space for the school. Occupied Site Complex Logistics Structural Alterations Client: Hampton School Contract:JCT Standard Building Contract with Quants        Value: Quad Infill – £4.8mTB4 – £3m Working closely with the operational school in multiple phases, we delivered the expansion and renewal of specialist teaching spaces. This included a vertical extension of an existing two-storey block, construction of a new three-storey teaching and offices block, including a Central Pod with quiet study and a Quad space between the Central Pod and surrounding buildings. “The three-storey development within the existing Hammond Quad area of the School represents one of the most significant engineering challenges undertaken on our site. The centre significantly enhances the School’s existing teaching facilities and also provides an innovative study area for our Sixth Formers. It offers Hamptonians flexible work spaces, along with private study areas and individual workstations.” Hampton School GALLERY IMAGES FOR Hampton School Previous Next

Hampton School Quad Infill Read More »