Neilcott Construction Limited

Edit Content

Fitouts

Fitouts

Victoria Gate

Victoria Gate Fit out & refurbishment of Victoria Gate workplace for Surrey County Council Improved accessibility Bike store alterations Additional storage Fit out & refurbishment Client:Surrey County Council Contract:JCT Design & Build Value:£2.6m Surrey County Council has announced it is to move some of its services into the Victoria Gate building in Woking. Neilcott have been appointed to deliver Phase 2 of the works for Victoria Gate, which include fit out and refurbishment. The works will include the formation of a new external ramp, basement shower modifications, bike store alterations & additional storage, ground floor office alterations, new fire lobbies and tea points, together with accessibility improvements. “This strategic move reaffirms Surrey County Council’s commitment to creating a conducive work environment while aligning with our broader objectives of sustainability and improved service delivery.” Natalie Bramhall, cabinet member for property, waste and infrastructure. GALLERY IMAGES FOR Victoria Gate Previous Next

Victoria Gate Read More »

Tottenham Court Road

213 – 215 Tottenham Court Road Strip out & refurbishment works to bring a busy central London office space up to CAT A standard Comprehensive M&E upgrades Disabled WC amendments Full redecoration Roof refurbishment  Client:City of London Contract:JCT SBC XQ Value:£2.7m The project comprised of bringing the 3rd and 4th floor office space up to CAT A standard. The works included the strip out of the previous tenant’s partitions and fit out generally, providing new building services to serve two floors, new raised access floor, new lighting, disable WC amendments to form new shower facilities, new data installation and full redecoration. Works to common parts included redecoration of the stair cores and upgrade of the ground floor entrance lobby fronting Alfred Place, plus a roof refurbishment. GALLERY IMAGES FOR 213 – 215 Tottenham Court Road Previous Next

Tottenham Court Road Read More »

UEL Summer Works 23

UEL Summer Works 23 Refurbishment, fit out and external landscaping within a live University campus Tfl liaison Complex logistics Sculpture installation Client:University of East London Contract:JCT D&B Value:£2.7m Refurbishment, reconfiguration and fit out of a range of buildings/areas at the Docklands Campus (including AVA Buildings, Library, Knowledge Dock, East Building, Sports Dock), as well as the installation of the ‘Timeless Flight’ sculpture and associated landscaping works. Works included demolition and installation of internal partitions, installation of new M&E systems, joinery, finishes, fixtures fittings and furnishings. Alongside installation of artwork, vinyl’s and signage externally as part of the Active Campus scheme. “Throughout the project, Neilcott responded promptly and efficiently and were extremely accommodating with last minute changes to various elements in the programme. I highly recommend Neilcott and look forward to working with them again in the future.’’ Marc Theron, Senior Project Manager, University of East London GALLERY IMAGES FOR UEL Summer Works 23 Previous Next

UEL Summer Works 23 Read More »

Churchill Court

Churchill Court Remodelling, refurbishment & fit out works to Churchill Court, to facilitate London Borough of Bromley’s relocation from their former civic offices. Phased scheme New layouts & reconfiguration CAT B fit out Lift replacement Client:London Borough of Bromley Contract:JCT D&B Value:£9m To facilitate the relocation for the London Borough of Bromley’s Civic Offices, the works comprised of the internal CAT B fit out, with new layouts, reconfigured and refurbished main reception, a new reception serving the public at lower level, a new democratic hub with committee rooms, council chamber, mayoral suite, refurbished office accommodation to all other areas including the replacement of life expired plant and introduction of replacement mechanical and electrical plant. “I would like to thank all the staff and contractors who have worked tirelessly to deliver the new Chamber on time and to support the transition of staff to the new building. This has been a very complex task.” Mayor of Bromley, Councillor David Jefferys GALLERY IMAGES FOR Churchill Court Previous Next

Churchill Court Read More »

20 Orange Street

20 Orange Street Renewing, altering & fitting out ‘plug & play’ commercial office space to help Westminster City Council secure new tenants & valuable revenue streams CAT A+ finish Occupied Building H&S Interface Bike storage Client:Westminster City Council Contract:JCT D&B Value:£2.2m Refurbishment, remodelling & fit-out of 20 Orange Street to provide refreshed office space & associated facilities for third-party rental. A key objective of this scheme was to upgrade & improve the ‘tenant journey’ from entrance, through to lift, core stairs & toilets. Key areas included CAT A fit out to Level 1 to provide ‘tenant-ready’ space, modernisation of Level 5, Ground and Basement floors, including new shower, changing room facilities, bike storage and lockers, providing a modern, brighter feel to the reception area and upgrades to toilets to improve aesthetics. GALLERY IMAGES FOR 20 Orange Street Previous Next

20 Orange Street Read More »

82 Great Suffolk Street

82 Great Suffolk St Fast track fit out to create unique new office space for a PR & Marketing firm within a historic railway arch CAT B Finish HQ Office Space Quirky Railway Arch Bespoke Joinery Client:Vested Emea Ltd Contract:JCT SBC Value:£250k Flexible working area provided for staff of a PR and marketing company based in London. Fast track fit out works provided a bespoke ‘pod’ meeting room, new tea points, lighting, AC, floor finishes, furniture, bespoke joinery and modern mobile phone based access control technology. Works included the strip out and installation of flooring, fitting of a meeting room and installation of IT and conference facilities. GALLERY IMAGES FOR 82 Great Suffolk St First day in the new Vested office in Southwark, 23-02-2023 First day in the new Vested office in Southwark, 23-02-2023 First day in the new Vested office in Southwark, 23-02-2023 Previous Next

82 Great Suffolk Street Read More »

Bayes Business School

Bayes Business School Creating a new landmark base for this globally renowned Business School within 33 Finsbury Sq CAT B Fit Out Landmark Quality Occupied Higher Education Campus SKA Gold Rating Client:City University London Contract:JCT Design & Build Value:£14.2m CAT B refurbishment and fit out works across 9 storeys, including basement and lightwell, to upgrade existing facilities and provide a new HQ for the Bayes Business School, bringing together departments and specialists from across the campus to a centralised building for all business related courses. Neilcott undertook fit out works throughout the building to facilitate the growth of the school and enhance the way it delivers education, delivering 5 new lecture theatres, new executive offices and meeting rooms, syndicate rooms, new comms, AHU and plant upgrades and feature timber ceiling and wall panelling throughout. “Since having taken occupation, the responses have been nothing but praise for how the spaces have been transformed into cutting-edge learning environments.” Guido de Koning, Associate Project Manager, Property & Facilities, City, University of London GALLERY IMAGES FOR Bayes Business School Previous Next

Bayes Business School Read More »

Marylebone High Street

Marylebone High Street Reinvigorating commercial, retail & education facilities on live site with constrained access Steel Frame Temporary Works Logistics Client:Howard de Walden Estates Contract:JCT Standard Building Contract Value:£9.5m Complex redevelopment works at historic 110 Marylebone High Street for repeat client Howard de Walden. Enabling and Main Works contracts involved whole building refurbishment and demolition of part of the existing building on St Vincent Street, along with new-build infill extension, internal structural alterations of the exiting building and fit-out works across the site. This created high quality new CAT A office space, two floors of leisure facilities for Soul Cycle and a new nursery space.   GALLERY IMAGES FOR Marylebone High Street Previous Next

Marylebone High Street Read More »

16 Waterloo Place 001

16 Waterloo Place

16 Waterloo Place Sensitively restoring an old bank, converting it to a CAT B commercial office, with gallery & temperature controlled archive storage CAT B Fit Out Restoration Works Grade II Listed Building Central London Client:ABG Images UK Contract:JCT IBC with Design Value:£1m 16 Waterloo Place is located in the City of Westminster and is a self-contained former banking hall. Waterloo Place was built in the early 1900s, is Grade II listed and lies within the St James Conservation Area. The project involved the refurbishment of the existing building to form a gallery space, office space & meeting areas. The works included demolishing the existing entrance lobby, alterations at basement level to enable an office fit out with bespoke joinery, including the construction of a temperature controlled negatives storage area, new finishes and M&E throughout, and alterationsto the mezzanine level to accommodate new meeting rooms. “Neilcott is a reliable main contractor and the successful refurbishment of 16 Waterloo Place is a testament to Neilcott’s competence. Should we have any future projects, we would not hesitate to engage their services again.” Jazz Gill, Chief Financial & Operations Officer, Iconic Images GALLERY IMAGES FOR 16 Waterloo Place Previous Next

16 Waterloo Place Read More »