Neilcott Construction Limited

Shae Davies

Redbridge Fire Station

Redbridge Fire Station Modernising essential facilities while keeping frontline services moving. Demolition Refurb & extension Enhanced functionality Client:Hampshire & Isle of Wight Fire and Rescue Authority Contract:JCT D&B Value:£3.7m Demolition of part of the existing building, alongside the refurbishment and extension of the fire station and Border Force offices. The works include upgrading the existing facilities, overcladding the fire station to improve the building envelope, and delivering new vehicular site arrangements to support improved access and day-to-day operations. The scheme has been designed to enhance the functionality, appearance and long-term performance of the site while supporting the needs of key emergency and border service teams. GALLERY IMAGES FOR Redbridge Fire Station skip render: ucaddon_next_prev_post

Redbridge Fire Station Read More »

The Squirrels Short Breaks

Squirrels Short Breaks New supported independent living accommodation in accordance with LETI Communal areas Accessibility Thoughtful design Respite care Client:Surrey County Council Contract:JCT Design & Build Value:£4.6m Demolition of the existing building at the Horseshoe Banstead and the design & construction of a new Single Storey 550m2 high quality Short Breaks accommodation with 8 No. ensuite bedroom units for wheelchair users, a communal area, staff area and associated garden space. The new centre will provide respite care for working aged adults with learning disabilities/autism.  GALLERY IMAGES FOR The squirrels short breaks skip render: ucaddon_next_prev_post

The Squirrels Short Breaks Read More »

All Saints SEMH School

All Saints SEMH School A carefully planned environment for learning and wellbeing Demolition M&E upgrades Extension Client:Bracknell Forest District Council Contract:JCT D&B Value:£8.8m Design and construction of a new Special Educational Needs and Mental Health (SEMH) school for up to 50 pupils at the former All Saints Church of England Primary School site in Warfield, Bracknell. The works include building a new two-storey extension, linked to the existing building via a single-storey corridor. The scheme also covers the refurbishment of part of the existing structure, partial demolition of buildings, and removal of temporary units, all delivered under one contract. GALLERY IMAGES FOr All saints skip render: ucaddon_next_prev_post

All Saints SEMH School Read More »

Meadowcroft Primary School

Meadowcroft Primary School Creating space for pupils to grow, learn and thrive. New build Refurbishment MUGA Client:Surrey County Council Contract:JCT Intermediate Building Contract with Contractor’s Design 2016 Value:£5.2m Provision of a new school building, refurbishment works and wider site improvements to support the school’s expansion into a one form entry all-through setting. The works include four new classrooms, a library and group learning spaces, hygiene facilities, indoor and outdoor teaching areas, a multi-use games area, landscaping, services upgrades and improvements to the existing building.  GALLERY IMAGES FOr meadowcroft skip render: ucaddon_next_prev_post

Meadowcroft Primary School Read More »

New Line Academy & Tiger Primary School

New Line Academy & Tiger Primary New, enhanced learning & performance spaces Music block Specialist practice rooms New performance hall Client:Future Schools Trust Contract:JCT D&B 2024 Value:£6m The new development will include four modern classrooms, specialist practice rooms, a new performance hall,two new early years classrooms & a vibrant activity hall. These facilities will be united within a single, purpose-built structure, featuring a shared lobby that seamlessly connects Tiger Primary School’s activity hall with New Line Learning Academy’s new teaching and performance spaces. GALLERY IMAGES FOr New line & Tiger skip render: ucaddon_next_prev_post

New Line Academy & Tiger Primary School Read More »

Neilcott Appointed to Deliver North London Hospice’s Inpatient Unit

News & Views Project Win: North London Hospice Back to news & views North London Hospice unveils ambitious plans to rebuild its Inpatient Unit North London Hospice has unveiled plans to rebuild its Inpatient Unit at Woodside Park in Finchley. The project is the most ambitious venture that the charity has undertaken since the unit was built more than 30 years ago. After extensive consultation and research, including exploring several different options, hospice leaders concluded that a complete redevelopment of the Inpatient Unit is the best solution for the hospice to meet future needs of patients. Following a competitive tendering process, Neilcott Construction Ltd has been appointed as the contractor to undertake the rebuilding project which is expected to cost around £10 million and will commence in August 2026. The hospice will be continuing to provide both inpatient as well as community services during this time. A temporary Inpatient Unit will be operating from the Jade Ward at Edgware Community Hospital from 1 July 2026. It is anticipated that the newly rebuilt Inpatient Unit will open in August 2027. The project, Building For Tomorrow, has been funded through a mixture of major donors, trusts and private sponsors as well as some government funding. The hospice still needs to raise the remaining £2.4 million required so will be launching a public appeal in autumn, asking the community to come together to all support the charity, just like they did more than 40 years ago.   About North London Hospice North London Hospice receives referrals for over 3,500 patients with a life-limiting illness every year. Providing support for patients, their families, friends and carers.   Founded in 1984, they are the UK’s first multi-faith hospice and welcome people from all faiths, including no faith, from diverse communities within the boroughs of Barnet, Enfield and Haringey. They also offer some of their services to people within Camden and Islington.      North London Hospice provide physical, emotional and spiritual care to patients and families, friends and carers. They are committed to empowering patients through their vision, which is to provide the best of life, at the end of life, for everyone. North London Hospice is a registered charity, and their services are provided free of charge, but it now costs over £16 million a year to run the charity. Whilst around a third of the amount comes from the NHS, they rely on the generosity of the community through donations and their charity shops to make up the shortfall in funding.

Neilcott Appointed to Deliver North London Hospice’s Inpatient Unit Read More »

Alexandra Theatre

Alexandra Theate A renewed theatre for performance and community New build extension Community leisure Pagabo Framework Client:Arun District Council Contract:2-Stage D&B Value:£12.1m Procured via a two stage design and build contract through the PAGABO framework, the project has helped to deliver the council’s Vision of fulfilling Arun’s economic potential. The Main Works comprised of the demolition of the existing WC block & replacement with new, including accessible toilets, changing places & external showers. As well as improvements & expansion of the West Green Car Park, & provision of a new concession area, activity hub & volleyball & basketball areas. GALLERY IMAGES FOR Alexandra Theatre skip render: ucaddon_next_prev_post

Alexandra Theatre Read More »

Victoria Road & Cottesmore Gardens

Victoria Rd & Cottesmore Gardens Transforming heritage into high-quality living Heritage refurbishment Central London logistics High-specification residential conversion Client:W8 DevelopmentsContract:JCT D&BValue:£14.5m Two neighbouring high-end residential conversion and refurbishment schemes in central London, transforming former school buildings into 13 private apartments.The works combine heritage-sensitive refurbishment, high-specification finishes and coordinated delivery across two constrained residential sites. GALLERY IMAGES FOR Victoria Rd & Cottesmore Gardens skip render: ucaddon_next_prev_post

Victoria Road & Cottesmore Gardens Read More »

Brixton Rec Decoupling

Brixton Decoupling Decoupling Brixton Recreation Centre & International House: A Seamless Separation for Growth M&E Minor demolition Mezzanine Client:London Borough of Lambeth Contract:JCT D&B Value:£5.2m Decoupling of Brixton Recreation Centre from International House, enabling future redevelopment while keeping the leisure centre operational.The works include separating shared utilities, creating a new Energy Centre, mechanical and electrical upgrades, minor demolition, and careful phased commissioning. GALLERY IMAGES FOR Brixton Decoupling skip render: ucaddon_next_prev_post

Brixton Rec Decoupling Read More »

Bromley North Housing

Bromley North Regeneration for high-quality local housing in Bromley. Public housing Estate regeneration Live residential community Client:London Borough of Bromley Contract:JCT Design & Build Value:£26.3m The Bromley North Housing regeneration scheme for the London Borough of Bromley, provides 75 new residential units across two blocks with three ground-floor commercial spaces.The project includes social rent and private sale homes, delivered within a constrained live residential setting beside Bromley North Station. GALLERY IMAGES FOR Bromley North Housing skip render: ucaddon_next_prev_post

Bromley North Housing Read More »